There is a history of milling on the Gelvin River and this project combines the location of an old weir with modern pipe technology to develop a fall of 38 meters.
This hydro project has been constructed in a river with the highest possible environmental protection, it is an SAC for salmon. This was a significant consideration through out the design, planning application and construction stages of the project.
HydroNI were responsible for the feasibility study, planning application, construction standard drawings, project management of the construction of the project, installation and commission of all equipment.
Crossflow Turbine
Turbine Rating: 112 kW
Gross head: 38 meters
Maximum flow: 399 litres / second
____________________________________
The project included:
Diversion of the Gelvin River to enable the construction of a new weir.
Construction of a new pool type fish pass.
Installation of 1400m of pipe.
Construction of a new turbine house and tail race.
Installation and commissioning of turbine.
Turbine output is exceeding expectation.
______________________________________
"Although the initial outlay was huge, the payback in the first 3 months is as predicted and perhaps a little bit more.